Openings for a remodel
For a new doorway, a moved wall or rewiring, we remove only the sections the plan calls for. The rest of the wall stays in place.
Typical cost in Woodbury
Joint compound, the mud that covers drywall seams and corners, is one of the home products MDH lists as possibly containing asbestos, and plaster is on the list too. When a lab confirms it in your walls, we cut out and bag the affected drywall inside a sealed work area before your remodeler opens anything.
Planning a new opening, a moved wall or an addition in Woodbury, Maplewood or Oakdale? Have the walls sampled first, then call us if the results come back positive.

For a new doorway, a moved wall or rewiring, we remove only the sections the plan calls for. The rest of the wall stays in place.
When a room is gutted, the positive drywall and compound come down in sheets and go into leak-tight, labeled containers.
Older plaster and the coats over it are sampled separately from any drywall, so each layer gets its own result.
Patching a hole or two in a wall still calls for care. Work under the state limit falls outside MDH regulation, but MDH points out that this is no promise of safety, so a licensed crew is still the right call.
On walls and most other parts of a home, the cutoff is more than 6 square feet of friable material. That work belongs to an MDH-licensed asbestos contractor, and no remodeler, electrician or plumber may do it without that license. MDH must get written notice of licensed work five or more calendar days before it begins.
Woodbury folds remodels and additions into a combination permit. The city’s permit page does not cover asbestos, so test the walls and ceilings you will cut into before the permitted work begins.

Ceiling texture too? See popcorn ceiling removal or go back to the home page.
We recommend calling, but do feel free to contact us using this form. We'll get back to you with a free, personalized quote or additional questions as soon as possible. We're here to help.
Call (651) 318-4198